Megawatt Mosaic Ltd funded its pre-seed raise in 2022.
Since then, along with our partners we have analysed 744 Italian substations and Megawatt Mosaic has invested in the pre-construction development of the following 10 Battery Energy Storage Sites.
Pre-construction development is all the preparation that occurs to achieve the status of Ready to Build.
In each case, Megawatt Mosaic has exited successfully from each one, at a profit.
Project 56: Lazio
- 84MWn
- Filing month 03/2023
- Grid capacity (est.) month 05/2023
Project 630: Piedmont
- 125MWn
- Filing month 04/2023
- Grid capacity (est.) month 07/2023
Project 18: Sardinia
- 198MWn
- Filing month 01/2023
- Grid capacity (est.) month 04/2023
- Grid capacity granted (51 calendar days)
Project 30: Sardinia
- 54MWn
- Filing month 01/2023
- Grid capacity (est.) month 04/2023
- Grid capacity granted (51 calendar days)
Project 106: Sicily
- 93MWn
- Filing month 04/2023
- Grid capacity (est.) month 07/2023
Project F150: Puglia
- 150MWn
- Filing month 12/2022
- Grid capacity (est.) month 03/2023
- Grid capacity granted (39 calendar days)
Project A198: Puglia
- 198MWn
- Filing month 03/2023
- Grid capacity (est.) month 06/2023
- Grid capacity granted (25 calendar days)
Project 16: Puglia
- 198MWn
- Filing month 01/2023
- Grid capacity (est.) month 04/2023
- Grid capacity granted (47 calendar days)
Project 637a: Puglia
- 198MWn
- Filing month 05/2023
- Grid capacity (est.) month 08/2023
Project 637b: Puglia
- 70MWn
- Filing month 05/2023
- Grid capacity (est.) month 08/2023

Now Megawatt Mosaic is marketing 4 * circa 100MW sites to institutional investors that wish to construct the projects, which are in the last mile of pre-construction development. We hope to gain the role of EPCM in the construction of said projects.
For those with contacts in the BESS industry, we offer a success fee of 1% on the 375M required to construct said projects.
Please note, this is for institutional investors only. Unless you happen to have €375M in your current account.