{"id":33845,"date":"2026-03-28T02:27:50","date_gmt":"2026-03-28T02:27:50","guid":{"rendered":"https:\/\/350ppm.co.uk\/blog\/?p=33845"},"modified":"2026-03-28T02:27:51","modified_gmt":"2026-03-28T02:27:51","slug":"a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment","status":"publish","type":"post","link":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/","title":{"rendered":"A new approach to industrial energy generation is moving from validation to commercial deployment"},"content":{"rendered":"\n<p>A new approach to industrial energy generation is moving from validation to commercial deployment.<br><br><a href=\"https:\/\/www.linkedin.com\/company\/eng8\/\">ENG8 Energy<\/a> is a deep-tech energy company that is commercialising one of the most genuinely promising clean energy technologies in development today.<br><br>This week, ENG8 launched its 100 kW Modular Thermal Power Generator at IWAHLM-17 in Bergamo, Italy.<br><br>EnergiCells are low energy nuclear reaction (LENR) reactors that generate five to ten times more thermal, electrical and chemical energy than the electricity put in (COP\/Q5 to 10).<br><br>ENG8\u2019s estimated thermal, electrical and chemical (HHO) generation cost is \u20ac15\/MWh, compared to European oil and gas prices of \u20ac60+\/MWh and electrical costs of \u20ac100\/MWh.<br><br>The EnergiCell\u00ae has been independently validated on multiple occasions since 2020, confirming net energy export and sustained operation, including a self-powering configuration\u2026 verified on two separate occasions.<br><br>350PPM was instrumental in raising \u20ac3 million for ENG8 in 2023\/4 from over 100 investors, with share value increasing from \u20ac2 per share to \u20ac20 per share this year.<br><br>ENG8 is now actively engaged in discussions with strategic investors to raise \u20ac20 million to finish development, testing and installing the first megawatt of generating capacity at a client\u2019s premises.<br><br>The company is still open to investment from individuals.<br><br>If you would like to learn more, receive further information, or arrange a conversation with the team, please feel free to get in touch.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new approach to industrial energy generation is moving from validation to commercial deployment. ENG8 Energy is a deep-tech energy company that is commercialising one of the most genuinely promising clean energy technologies in development today. This week, ENG8 launched its 100 kW Modular Thermal Power Generator at IWAHLM-17 in Bergamo, Italy. EnergiCells are low [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47,70],"tags":[],"class_list":["post-33845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-updates"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events\" \/>\n<meta property=\"og:description\" content=\"A new approach to industrial energy generation is moving from validation to commercial deployment. ENG8 Energy is a deep-tech energy company that is commercialising one of the most genuinely promising clean energy technologies in development today. This week, ENG8 launched its 100 kW Modular Thermal Power Generator at IWAHLM-17 in Bergamo, Italy. EnergiCells are low [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/\" \/>\n<meta property=\"og:site_name\" content=\"News and Events\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-28T02:27:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-28T02:27:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"677\" \/>\n\t<meta property=\"og:image:height\" content=\"448\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/\",\"name\":\"A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events\",\"isPartOf\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg\",\"datePublished\":\"2026-03-28T02:27:50+00:00\",\"dateModified\":\"2026-03-28T02:27:51+00:00\",\"author\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914\"},\"breadcrumb\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg\",\"contentUrl\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg\",\"width\":677,\"height\":448},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/350ppm.co.uk\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A new approach to industrial energy generation is moving from validation to commercial deployment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#website\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/\",\"name\":\"News and Events\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/350ppm.co.uk\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/350ppm.co.uk\/blog\"],\"url\":\"https:\/\/350ppm.co.uk\/blog\/author\/admin_350ppm\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/","og_locale":"en_GB","og_type":"article","og_title":"A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events","og_description":"A new approach to industrial energy generation is moving from validation to commercial deployment. ENG8 Energy is a deep-tech energy company that is commercialising one of the most genuinely promising clean energy technologies in development today. This week, ENG8 launched its 100 kW Modular Thermal Power Generator at IWAHLM-17 in Bergamo, Italy. EnergiCells are low [&hellip;]","og_url":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/","og_site_name":"News and Events","article_published_time":"2026-03-28T02:27:50+00:00","article_modified_time":"2026-03-28T02:27:51+00:00","og_image":[{"width":677,"height":448,"url":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/","url":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/","name":"A new approach to industrial energy generation is moving from validation to commercial deployment - News and Events","isPartOf":{"@id":"https:\/\/350ppm.co.uk\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage"},"image":{"@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage"},"thumbnailUrl":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg","datePublished":"2026-03-28T02:27:50+00:00","dateModified":"2026-03-28T02:27:51+00:00","author":{"@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914"},"breadcrumb":{"@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#primaryimage","url":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg","contentUrl":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2026\/03\/1774611727377.jpg","width":677,"height":448},{"@type":"BreadcrumbList","@id":"https:\/\/350ppm.co.uk\/blog\/a-new-approach-to-industrial-energy-generation-is-moving-from-validation-to-commercial-deployment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/350ppm.co.uk\/blog\/"},{"@type":"ListItem","position":2,"name":"A new approach to industrial energy generation is moving from validation to commercial deployment"}]},{"@type":"WebSite","@id":"https:\/\/350ppm.co.uk\/blog\/#website","url":"https:\/\/350ppm.co.uk\/blog\/","name":"News and Events","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/350ppm.co.uk\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/350ppm.co.uk\/blog"],"url":"https:\/\/350ppm.co.uk\/blog\/author\/admin_350ppm\/"}]}},"_links":{"self":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts\/33845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=33845"}],"version-history":[{"count":1,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts\/33845\/revisions"}],"predecessor-version":[{"id":33847,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts\/33845\/revisions\/33847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/media\/33846"}],"wp:attachment":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=33845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=33845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=33845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}