{"id":31718,"date":"2023-10-21T11:05:00","date_gmt":"2023-10-21T11:05:00","guid":{"rendered":"https:\/\/350ppm.co.uk\/?p=31718"},"modified":"2023-10-21T11:05:00","modified_gmt":"2023-10-21T11:05:00","slug":"350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows","status":"publish","type":"post","link":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/","title":{"rendered":"350 PPM Updates: ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows"},"content":{"rendered":"\n<p> News from two companies we are working with. Here are the updates from the companies themselves: <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"441\" src=\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2024\/07\/ENG8-Long-1024x441.jpg\" alt=\"\" class=\"wp-image-31562\"\/><\/figure>\n\n\n\n<p><strong>ENG8 (International) Ltd<\/strong><\/p>\n\n\n\n<p>ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority on Thursday 19th October 2023.\u00a0In each run of circa 10 minutes, it scored circa 5; 1 unit of energy in, 5 liberated by fusion, so net 4. We must wait for the full report to see the exact figure. An independent validator, that tested it, thinks it can go up to a Q Value of 30.\u00a0There is a lot of discussion about the hierarchy of energy generation. This is really graded over five determinants: <\/p>\n\n\n\n<p>1- Baseload \u2013 non intermittent Vs intermittent<\/p>\n\n\n\n<p>2- Excess Heat Produced \u2013 please remember that heat is the root cause of climate change, not emissions, so conventional nuclear is marked down, along with the new nuclear options.<\/p>\n\n\n\n<p>3- Centralisation Versus Decentralised\/Point of Use: is power produced where it\u2019s needed: this is very important given the current grid constraints.<\/p>\n\n\n\n<p>4- Emissions \u2013 gaseous and particulate pollution from manufacturing and in supply chain \u2013 solar panel manufacture is not exactly environmental but produces no emissions.<\/p>\n\n\n\n<p>5- Cost per MWh of generation.<\/p>\n\n\n\n<p>In all of these measurements , it appears that ENG8\u2019s EnergiCells come out on top. No intermittency, power at point of use, whether in the house or in the car or elsewhere, no emissions- gaseous or particulate,&nbsp;and low cost energy, this will be determined by manufacturing and distribution costs but ENG8\u2019s EnergiCells are on track to provide a low cost and secure source of energy for domestic and commercial users. &nbsp;&nbsp;<\/p>\n\n\n\n<p>350 PPM\u2019s efforts to assist ENG8 in raising funding will most likely be curtailed shortly, as they step into the big league. Metaphorically speaking, they are out of nappies now and off to nursery.&nbsp;<\/p>\n\n\n\n<p>You can still register here for an information memorandum and our involvement will continue, but increasingly, we are seeing the larger institutional investors step in now: <\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/eng8.energy\/register\/\" style=\"border-radius:8px;background-color:#106b22\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Get ENG8&#8217;s Information Memorandum<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<p>The resultant hike in valuation due shortly may also make it less attractive for individual investors.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2024\/07\/pyro-logo-5-1024x360.png\" alt=\"\" class=\"wp-image-31414\" width=\"564\" height=\"198\"\/><\/figure><\/div>\n\n\n\n<p><strong>PYROLYSISE LTD<\/strong><\/p>\n\n\n\n<p>Pyrolysise Ltd, conversely, is six months to a year behind ENG8 and looking for support for development of its first Waste Carbonisation Plant (WCP).<\/p>\n\n\n\n<p>Carbonisation, which is an extreme form of Pyrolysis, featuring two chambers, is really gaining traction as a solution to process completely unsorted waste.<\/p>\n\n\n\n<p>We have had a lot of interest from the industry and interestingly Water companies, seeking to process their waste, and turn this into bio-char, which is considered to be black gold:&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/350ppm.co.uk\/betting-big-on-black-gold-for-the-offset-market\/\" style=\"border-radius:8px;background-color:#106b22\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Betting Big on Black Gold<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<p>This is much more acceptable than pumping out effluent directly into our rivers, completely illegally. This scandal has been in the news recently and the water companies are keen to resolve this issue.<\/p>\n\n\n\n<p>The overall market is wide open, ripe for consolidation and desperate for an environmental solution that not only produces offtakes, emissions and particulate pollutants free, but offtakes that produce baseload power. 350 PPM is heavily involved and the WCPs will be branded as 350 Pyrolysise, to accentuate our environmental credentials.<\/p>\n\n\n\n<p>Pyrolysise is still in its metaphorical nappies, but should be revenue positive within one year, solving many environmental and humanitarian problems, especially waste and housing.<\/p>\n\n\n\n<p>Here\u2019s the video:<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/pyrolysise.com\/pyrolysise-monetising-waste-and-landfills-worldwide\/\" style=\"border-radius:8px;background-color:#106b22\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Pyrolysise&#8217;s Video<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<p> Register for an IM below if your interested in having a look:&nbsp; <\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/pyrolysise.com\/register\/\" style=\"border-radius:8px;background-color:#106b22\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Get Pyrolsysise&#8217;s Information Memorandum<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<p>Kind Regards<\/p>\n\n\n\n<p><strong>Nicholas Dimmock (BA MBA CASS)<br>Managing Director<br>350 PPM Ltd<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>ABOUT 350 PPM LTD<\/strong>&nbsp;350 PPM LTD is an incubator and accelerator for early-stage companies operating in the clean energy and environmental protection sectors. Working from within our clients companies we deliver a wide range of services to support and drive their business growth. Our team of 7 becomes part of their team, aligning our objectives to ensure can provide maximum guidance and expertise to achieve their business goals.&nbsp;<br><br><strong>Our services<\/strong><br><br>Securing funding from a wide range of investors at key stages; this will include angel investors, family offices, venture capital funds, and institutional investors.<br>Providing input on developing business plans.<br>Preparing Information Memoranda and other marketing material to support the fund raising.<br>Sales, marketing, and PR campaigns to increase exposure of our clients with key audiences and other stakeholders.<br>Accountancy and financial management.<br>Ulilising our established networks to recommend suitable professional service providers such as accountants and lawyers.<br>Acting as interim directors on client boards.<br>Setting up boards of directors to give direction and provide corporate governance.<br>Supporting clients with commercial contracts and negotiations with potential partners and suppliers.<br>Administration of Fundraises including; Subscription Bundles, Trade Ledgers, Shareholder Registers, Client KYC and Transaction Settlement and fullfillment.<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>News from two companies we are working with. Here are the updates from the companies themselves: ENG8 (International) Ltd ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority on Thursday 19th October 2023.\u00a0In each run of circa 10 minutes, it scored circa 5; 1 unit of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":28519,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47,70],"tags":[55,56,204],"class_list":["post-31718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-updates","tag-350-ppm-ltd","tag-eng8","tag-pyrolysise"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows<\/title>\n<meta name=\"description\" content=\"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows\" \/>\n<meta property=\"og:description\" content=\"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority\" \/>\n<meta property=\"og:url\" content=\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/\" \/>\n<meta property=\"og:site_name\" content=\"News and Events\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-21T11:05:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2018\/02\/350-elephant-2by-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"447\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2018\/02\/350-elephant-2by-1.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/\",\"name\":\"ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows\",\"isPartOf\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg\",\"datePublished\":\"2023-10-21T11:05:00+00:00\",\"author\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914\"},\"description\":\"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority\",\"breadcrumb\":{\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg\",\"contentUrl\":\"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg\",\"width\":900,\"height\":447},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/350ppm.co.uk\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"350 PPM Updates: ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#website\",\"url\":\"https:\/\/350ppm.co.uk\/blog\/\",\"name\":\"News and Events\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/350ppm.co.uk\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/350ppm.co.uk\/blog\"],\"url\":\"https:\/\/350ppm.co.uk\/blog\/author\/admin_350ppm\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows","description":"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/","og_locale":"en_GB","og_type":"article","og_title":"ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows","og_description":"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority","og_url":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/","og_site_name":"News and Events","article_published_time":"2023-10-21T11:05:00+00:00","og_image":[{"width":900,"height":447,"url":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2018\/02\/350-elephant-2by-1.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_image":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2018\/02\/350-elephant-2by-1.jpg","twitter_misc":{"Written by":"admin","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/","url":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/","name":"ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows","isPartOf":{"@id":"https:\/\/350ppm.co.uk\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage"},"image":{"@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage"},"thumbnailUrl":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg","datePublished":"2023-10-21T11:05:00+00:00","author":{"@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914"},"description":"ENG8\u2019s Electrical to Electrical EnergiCell was tested at Culham Innovation Centre, home to The UK\u2019s Atomic Energy Authority","breadcrumb":{"@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#primaryimage","url":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg","contentUrl":"https:\/\/350ppm.co.uk\/blog\/wp-content\/uploads\/2020\/03\/350-elephant-2by-1-4.jpg","width":900,"height":447},{"@type":"BreadcrumbList","@id":"https:\/\/350ppm.co.uk\/blog\/350-ppm-updates-eng8-q-value-provisional-5-electrical-to-electrical-pyrolysise-gains-traction-as-application-grows\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/350ppm.co.uk\/blog\/"},{"@type":"ListItem","position":2,"name":"350 PPM Updates: ENG8 Q value provisional 5 electrical to electrical, Pyrolysise gains traction as application grows"}]},{"@type":"WebSite","@id":"https:\/\/350ppm.co.uk\/blog\/#website","url":"https:\/\/350ppm.co.uk\/blog\/","name":"News and Events","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/350ppm.co.uk\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/230c96fa1764157602f8abcc897c8914","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/350ppm.co.uk\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ea991a5dfe413bf7551f7c7d940ace56e0ca566959a5a5853f83a266fe1bbdf5?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/350ppm.co.uk\/blog"],"url":"https:\/\/350ppm.co.uk\/blog\/author\/admin_350ppm\/"}]}},"_links":{"self":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts\/31718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=31718"}],"version-history":[{"count":0,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/posts\/31718\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/media\/28519"}],"wp:attachment":[{"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=31718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=31718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/350ppm.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=31718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}